SMED

Rapid changeover techniques to minimize equipment setup time

Execution - Active

AI Query Interface

Ask questions in natural language

Try these sample queries:

Core Principles

Separate internal and external setup activities
Convert internal to external setup where possible
Streamline all aspects of setup operations
Eliminate adjustment and trial runs

Average Changeover Time

28minutes
-32.5%
Target: 15minutes
187%
Predicted: 21minutes88% confident

Changeovers per Shift

3.2count
+15.2%
Target: 5count
64%
Predicted: 3.9count84% confident

First Piece Quality

87%
+6.5%
Target: 95%
92%
Predicted: 91%86% confident

Real-Time Events & Alerts
1

RISK
low
...

Changeover Time Increasing

Average changeover time on Line 2 drifted from 21 to 26 minutes over past 2 weeks. Standardized work adherence declining.

Impact: Lost production time accumulating. Estimated $6K monthly impact if not corrected.
Recommended Action: Refresher SMED training for Line 2 team. Review changeover SOPs for compliance. Consider AR-guided changeover system pilot.
Explainability: Video analysis shows operators skipping pre-staging steps (external setup). Time regression correlates with recent staffing changes (r=0.79).
RL Score: 68%
AI Confidence: 81%

AI-Powered Improvement Opportunities

Total Potential: $532K/year

AI-Optimized Changeover Sequence

Impact: high
Effort: medium
$185K/yr
4-6 months
#5
89% AI confidence

Machine learning model analyzes 1000+ changeover videos to identify optimal motion sequences. Generates animated work instructions personalized to operator skill level.

RL Recommendation: Record all Line 3 changeovers for 2 months. Train model on best performers. A/B test AI-guided vs traditional instructions. Target 40% time reduction for new operators, 20% for experienced.
Explainability: AI optimization reduces average changeover from 28 to 17 minutes, adding 1.8 hours productive time per shift. At $850/hour line rate, saves $185K annually across 3 lines.

Automated Tool Presetting Station

Impact: high
Effort: high
$167K/yr
5-7 months
#4
90% AI confidence

Dedicated station for offline tool setup and measurement. RFID-tagged tools with stored offsets. Automated verification before loading to machine. Eliminates trial runs.

RL Recommendation: Install presetting station adjacent to CNC mills (highest changeover frequency). RFID all cutting tools. Integrate offsets into machine tool database. Validate tool life tracking improvements.
Explainability: Presetting eliminates 12-minute trial run from each changeover, adds 6.4 hours productive time per shift across 4 machines. Also reduces first-piece scrap by 78% ($35K annually).

Quick-Change Fixture System

Impact: medium
Effort: medium
$112K/yr
3-4 months
#3
92% AI confidence

Hydraulic-actuated fixtures with automatic clamping. RFID part recognition triggers correct clamp program. Reduce fixture changeover from 18 to 3 minutes.

RL Recommendation: Retrofit Line 2 fixtures first (8 changeovers/day). Hydraulic power already available. Program 12 common part profiles. Monitor clamping force consistency. Track time savings and setup errors.
Explainability: Reducing fixture change from 18 to 3 minutes saves 2 hours daily on Line 2 (8 changeovers). Eliminates misalignment errors worth $23K/year. Faster response to customer orders worth $89K NPS improvement.

AR-Guided Changeover Training

Impact: medium
Effort: low
$68K/yr
2-3 months
#3
86% AI confidence

Augmented reality headset overlays step-by-step instructions, highlights correct parts/tools, and validates each step completion. Reduces learning curve for new operators by 60%.

RL Recommendation: Deploy AR glasses to 6 newest operators. Create AR procedures for 3 most complex changeovers. Track time-to-competency vs traditional training. Measure error reduction and confidence scores.
Explainability: AR training reduces operator certification time from 6 weeks to 2.5 weeks, saving $45K in training costs annually. New operators achieve experienced-level changeover time 4 weeks faster.